User Tools

Site Tools


engage_space:power

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
engage_space:power [2018/05/01 21:29] hibbyengage_space:power [2018/05/13 14:07] – Inital Design dococassi
Line 1: Line 1:
 +
 +====== Distribution ======
 +
 +
  
 ====== Incoming Power ====== ====== Incoming Power ======
  
  
-Where do we get our power from, what is that cable rated to?+We have 4 supplies on 3 different phases coming to us 
 + 
 +  *  6 Amp Lighting (P2) 
 +  *  16 Amp Water Heater (P1) 
 +  *  32 Amp Shower (P2) 
 +  *  32 Amp Ring (P3) 
 + 
 +The cables run to the first floor and should be tapable there to continue to a Consumer unit int the dirty workshop 
 + 
 +I have a draft distributionwe will need to prioritize what parts to tackle first. 
 +{{file_electrical-01.pngDraft Electrical Termination Diagram}}
  
  
Line 10: Line 24:
 Our breakers are located in a box. Our breakers are located in a box.
  
-Where is the box?+Peter generously donated a consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door.
  
-How many breakers are there?+See the drawing above to identify required breakers in the box, there can be expansion
  
-Do we leave room for expansion?+TODO: 
 + 
 +  *  Identify and source breakers.
  
  
Line 20: Line 36:
  
  
-How are we laying out the rings. How many do we have? Are they 1 per room?+See drawing above for rings. O think we can get away with three one for each area.
  
 +TODO:
  
-====== Outlets ======+  *  How to run cables between floors. 
 +  *  Outlets locations 
 +  *  Conduit size and location
  
  
-How are we laying out the outlets, both physically (position) and electrically (which ring).+====== Per Device Breakers ======
  
  
-====== Per Device Breakers ======+ 
 +===== Test Benches ===== 
 + 
 + 
 +In each area have a test bench which has it's own RCBO  
 + 
 + 
 +===== Water Heater ===== 
 + 
 + 
 +In bathroom and shower, can we get rid of the shower? 
 + 
 + 
 +===== Ventilation ===== 
 + 
 + 
 +A Ventilation Fan and ducting 
 + 
 + 
 +===== Heater =====
  
  
-Are we going to have certain devices on their own?+Supply for each room.
  
  
Line 40: Line 78:
 Is there anything we want in the future that should be considered early on? Is there anything we want in the future that should be considered early on?
  
-  *  Kev's Testing Setup 
   *  Current consumption monitoring   *  Current consumption monitoring
  
  
  
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1