engage_space:power [2018/05/01 21:29] hibbyengage_space:power [2018/05/13 14:13] – /* Incoming Power */ dococassi
Line 1: Line 1:
 +
 +====== Distribution ======
 +
 +
  
 ====== Incoming Power ====== ====== Incoming Power ======
  
  
-Where do we get our power from, what is that cable rated to?+We have 4 supplies on 3 different phases coming to us 
 + 
 +  *  6 Amp Lighting (P2) 
 +  *  16 Amp Water Heater (P1) 
 +  *  32 Amp Shower (P2) 
 +  *  32 Amp Ring (P3) 
 + 
 +The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. 
 + 
 +Potentially we could change the breaker upstairs to 40 and use a 38breaker in out box which would remove the risk of tripping the breaker upstairs bu distributed load. 
 + 
 +I have a initial draft distribution setup,  we will need to prioritize what parts to tackle first. 
 +{{file_electrical-01.pngDraft Electrical Termination Diagram}}
  
  
Line 10: Line 26:
 Our breakers are located in a box. Our breakers are located in a box.
  
-Where is the box?+Peter generously donated a consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door.
  
-How many breakers are there?+See the drawing above to identify required breakers in the box, there can be expansion
  
-Do we leave room for expansion?+TODO: 
 + 
 +  *  Identify and source breakers.
  
  
Line 20: Line 38:
  
  
-How are we laying out the rings. How many do we have? Are they 1 per room?+See drawing above for rings. O think we can get away with three one for each area.
  
 +TODO:
  
-====== Outlets ======+  *  How to run cables between floors. 
 +  *  Outlets locations 
 +  *  Conduit size and location
  
  
-How are we laying out the outlets, both physically (position) and electrically (which ring).+====== Per Device Breakers ======
  
  
-====== Per Device Breakers ======+ 
 +===== Test Benches ===== 
 + 
 + 
 +In each area have a test bench which has it's own RCBO  
 + 
 + 
 +===== Water Heater ===== 
 + 
 + 
 +In bathroom and shower, can we get rid of the shower? 
 + 
 + 
 +===== Ventilation ===== 
 + 
 + 
 +A Ventilation Fan and ducting 
 + 
 + 
 +===== Heater =====
  
  
-Are we going to have certain devices on their own?+Supply for each room.
  
  
Line 40: Line 80:
 Is there anything we want in the future that should be considered early on? Is there anything we want in the future that should be considered early on?
  
-  *  Kev's Testing Setup 
   *  Current consumption monitoring   *  Current consumption monitoring
  
  
  