 +====== Distribution ======
 +
 +
  
 ====== Incoming Power ====== ====== Incoming Power ======
  
  
-Where do we get our power from, what is that cable rated to?+We have 4 supplies on 3 different phases coming to us
  
 +  *  6 Amp Lighting (P2)
 +  *  16 Amp Water Heater (P1)
 +  *  32 Amp Shower (P2)
 +  *  32 Amp Ring (P3)
  
-====== Circuit Breaker Box ======+The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable.
  
-Our breakers are located in a box.+Potentially we could change the breaker upstairs to 40A and use 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
  
-Where is the box? 
  
-How many breakers are there?+====== Consumer Unit ======
  
-Do we leave room for expansion? 
  
 +We have a schnider Easy9 Distribution box in the hall next to the dirty workshop
  
-====== Ring Main ====== 
  
 +====== Distribution ======
  
-How are we laying out the rings. How many do we have? Are they 1 per room? 
  
 +This will be done by 50mmx50mm Conduit you can see the plan for distribution below.
  
-====== Outlets ====== 
  
  
-How are we laying out the outlets, both physically (position) and electrically (which ring).+  {{file_floorplan-conduit.png?400x0}} 
 + 
  
  
Line 32: Line 40:
  
  
-Are we going to have certain devices on their own?+ 
 +===== Test Benches ===== 
 + 
 + 
 +In each area have a test bench which has it'own RCBO  
 + 
 + 
 +===== Water Heater ===== 
 + 
 + 
 +In bathroom and shower, can we get rid of the shower? 
 + 
 + 
 +===== Ventilation ===== 
 + 
 + 
 +A Ventilation Fan and ducting 
 + 
 + 
 +===== Heater ===== 
 + 
 + 
 +Supply for each room.
  
  
Line 40: Line 70:
 Is there anything we want in the future that should be considered early on? Is there anything we want in the future that should be considered early on?
  
-  *  Kev's Testing Setup 
   *  Current consumption monitoring   *  Current consumption monitoring
  
  
  