engage_space:power
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
engage_space:power [2018/05/01 21:29] – hibby | engage_space:power [2018/05/24 22:31] – dococassi | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | |||
+ | ====== Distribution ====== | ||
+ | |||
+ | |||
====== Incoming Power ====== | ====== Incoming Power ====== | ||
- | Where do we get our power from, what is that cable rated to? | + | We have 4 supplies on 3 different phases coming |
+ | * 6 Amp Lighting (P2) | ||
+ | * 16 Amp Water Heater (P1) | ||
+ | * 32 Amp Shower (P2) | ||
+ | * 32 Amp Ring (P3) | ||
- | ====== Circuit Breaker Box ====== | + | The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable. |
- | Our breakers are located in a box. | + | Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load. |
- | Where is the box? | ||
- | How many breakers are there? | + | ====== Consumer Unit ====== |
- | Do we leave room for expansion? | ||
+ | We have a schnider Easy9 Distribution box in the hall next to the dirty workshop | ||
- | ====== Ring Main ====== | ||
+ | ====== Distribution ====== | ||
- | How are we laying out the rings. How many do we have? Are they 1 per room? | ||
+ | This will be done by 50mmx50mm Conduit you can see the plan for distribution below. | ||
- | ====== Outlets ====== | ||
- | How are we laying out the outlets, both physically (position) and electrically (which ring). | + | {{file_floorplan-conduit.png? |
+ | |||
Line 32: | Line 40: | ||
- | Are we going to have certain devices on their own? | + | |
+ | ===== Test Benches ===== | ||
+ | |||
+ | |||
+ | In each area have a test bench which has it' | ||
+ | |||
+ | |||
+ | ===== Water Heater ===== | ||
+ | |||
+ | |||
+ | In bathroom and shower, can we get rid of the shower? | ||
+ | |||
+ | |||
+ | ===== Ventilation ===== | ||
+ | |||
+ | |||
+ | A Ventilation Fan and ducting | ||
+ | |||
+ | |||
+ | ===== Heater ===== | ||
+ | |||
+ | |||
+ | Supply for each room. | ||
Line 40: | Line 70: | ||
Is there anything we want in the future that should be considered early on? | Is there anything we want in the future that should be considered early on? | ||
- | * Kev's Testing Setup | ||
* Current consumption monitoring | * Current consumption monitoring | ||
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1