engage_space:power
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
engage_space:power [2018/05/01 21:29] – hibby | engage_space:power [2018/05/25 07:50] – /* Distribution */ dococassi | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | |||
+ | ====== Distribution ====== | ||
+ | |||
+ | |||
====== Incoming Power ====== | ====== Incoming Power ====== | ||
- | Where do we get our power from, what is that cable rated to? | + | We have 4 supplies on 3 different phases coming |
+ | * 6 Amp Lighting (P2) | ||
+ | * 16 Amp Water Heater (P1) | ||
+ | * 32 Amp Shower (P2) | ||
+ | * 32 Amp Ring (P3) | ||
- | ====== Circuit Breaker Box ====== | + | The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable. |
- | Our breakers are located in a box. | + | Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load. |
- | Where is the box? | ||
- | How many breakers are there? | + | ====== Consumer Unit ====== |
- | Do we leave room for expansion? | ||
+ | We have a schnider Easy9 Distribution box in the hall next to the dirty workshop | ||
- | ====== Ring Main ====== | ||
+ | ====== Distribution ====== | ||
- | How are we laying out the rings. How many do we have? Are they 1 per room? | ||
+ | This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking and Consumer unit, you can also see the board for work to be done. | ||
- | ====== Outlets ====== | ||
- | How are we laying out the outlets, both physically (position) and electrically (which ring). | + | {{file_floorplan-conduit.png? |
+ | |||
Line 32: | Line 40: | ||
- | Are we going to have certain devices on their own? | + | |
+ | ===== Test Benches ===== | ||
+ | |||
+ | |||
+ | In each area have a test bench which has it' | ||
+ | |||
+ | |||
+ | ===== Water Heater ===== | ||
+ | |||
+ | |||
+ | In bathroom and shower, can we get rid of the shower? | ||
+ | |||
+ | |||
+ | ===== Ventilation ===== | ||
+ | |||
+ | |||
+ | A Ventilation Fan and ducting | ||
+ | |||
+ | |||
+ | ===== Heater ===== | ||
+ | |||
+ | |||
+ | Supply for each room. | ||
Line 40: | Line 70: | ||
Is there anything we want in the future that should be considered early on? | Is there anything we want in the future that should be considered early on? | ||
- | * Kev's Testing Setup | ||
* Current consumption monitoring | * Current consumption monitoring | ||
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1