engage_space:power
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
engage_space:power [2018/05/10 19:32] – Irl moved page [[Power:ES]] to [[EngageSpace/Power]] irl | engage_space:power [2018/05/13 14:07] – Inital Design dococassi | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | |||
+ | ====== Distribution ====== | ||
+ | |||
+ | |||
====== Incoming Power ====== | ====== Incoming Power ====== | ||
- | Where do we get our power from, what is that cable rated to? | + | We have 4 supplies on 3 different phases coming to us |
+ | |||
+ | * 6 Amp Lighting (P2) | ||
+ | * 16 Amp Water Heater (P1) | ||
+ | * 32 Amp Shower (P2) | ||
+ | * 32 Amp Ring (P3) | ||
+ | |||
+ | The cables run to the first floor and should be tapable there to continue to a Consumer unit int the dirty workshop | ||
+ | |||
+ | I have a draft distribution, we will need to prioritize | ||
+ | {{file_electrical-01.pngDraft Electrical Termination Diagram}} | ||
Line 10: | Line 24: | ||
Our breakers are located in a box. | Our breakers are located in a box. | ||
- | Where is the box? | + | Peter generously donated a consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door. |
- | How many breakers | + | See the drawing above to identify required |
- | Do we leave room for expansion? | + | TODO: |
+ | |||
+ | * Identify and source breakers. | ||
Line 20: | Line 36: | ||
- | How are we laying out the rings. | + | See drawing above for rings. |
+ | TODO: | ||
- | ====== | + | * How to run cables between floors. |
+ | * | ||
+ | * Conduit size and location | ||
- | How are we laying out the outlets, both physically (position) and electrically (which ring). | + | ====== Per Device Breakers ====== |
- | ====== | + | |
+ | ===== Test Benches | ||
+ | |||
+ | |||
+ | In each area have a test bench which has it's own RCBO | ||
+ | |||
+ | |||
+ | ===== Water Heater ===== | ||
+ | |||
+ | |||
+ | In bathroom and shower, can we get rid of the shower? | ||
+ | |||
+ | |||
+ | ===== Ventilation ===== | ||
+ | |||
+ | |||
+ | A Ventilation Fan and ducting | ||
+ | |||
+ | |||
+ | ===== Heater | ||
- | Are we going to have certain devices on their own? | + | Supply for each room. |
Line 40: | Line 78: | ||
Is there anything we want in the future that should be considered early on? | Is there anything we want in the future that should be considered early on? | ||
- | * Kev's Testing Setup | ||
* Current consumption monitoring | * Current consumption monitoring | ||
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1