User Tools

Site Tools


engage_space:power

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
engage_space:power [2018/05/10 19:32] – Irl moved page [[Power:ES]] to [[EngageSpace/Power]] irlengage_space:power [2018/05/25 07:50] – /* Distribution */ dococassi
Line 1: Line 1:
 +
 +====== Distribution ======
 +
 +
  
 ====== Incoming Power ====== ====== Incoming Power ======
  
  
-Where do we get our power from, what is that cable rated to?+We have 4 supplies on 3 different phases coming to us
  
 +  *  6 Amp Lighting (P2)
 +  *  16 Amp Water Heater (P1)
 +  *  32 Amp Shower (P2)
 +  *  32 Amp Ring (P3)
  
-====== Circuit Breaker Box ======+The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable.
  
-Our breakers are located in a box.+Potentially we could change the breaker upstairs to 40A and use 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
  
-Where is the box? 
  
-How many breakers are there?+====== Consumer Unit ======
  
-Do we leave room for expansion? 
  
 +We have a schnider Easy9 Distribution box in the hall next to the dirty workshop
  
-====== Ring Main ====== 
  
 +====== Distribution ======
  
-How are we laying out the rings. How many do we have? Are they 1 per room? 
  
 +This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking and Consumer unit, you can also see the board for work to be done.
  
-====== Outlets ====== 
  
  
-How are we laying out the outlets, both physically (position) and electrically (which ring).+  {{file_floorplan-conduit.png?400x0}}{{file_m2-3.jpg?400x0}} 
 + 
  
  
Line 32: Line 40:
  
  
-Are we going to have certain devices on their own?+ 
 +===== Test Benches ===== 
 + 
 + 
 +In each area have a test bench which has it'own RCBO  
 + 
 + 
 +===== Water Heater ===== 
 + 
 + 
 +In bathroom and shower, can we get rid of the shower? 
 + 
 + 
 +===== Ventilation ===== 
 + 
 + 
 +A Ventilation Fan and ducting 
 + 
 + 
 +===== Heater ===== 
 + 
 + 
 +Supply for each room.
  
  
Line 40: Line 70:
 Is there anything we want in the future that should be considered early on? Is there anything we want in the future that should be considered early on?
  
-  *  Kev's Testing Setup 
   *  Current consumption monitoring   *  Current consumption monitoring
  
  
  
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1