User Tools

Site Tools


engage_space:power

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
engage_space:power [2018/05/13 14:07] – Inital Design dococassiengage_space:power [2018/05/13 14:13] – /* Incoming Power */ dococassi
Line 14: Line 14:
   *  32 Amp Ring (P3)   *  32 Amp Ring (P3)
  
-The cables run to the first floor and should be tapable there to continue to a Consumer unit int the dirty workshop+The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32.
  
-I have a draft distribution, we will need to prioritize what parts to tackle first.+Potentially we could change the breaker upstairs to 40 and use a 38, breaker in out box which would remove the risk of tripping the breaker upstairs bu distributed load. 
 + 
 +I have a initial draft distribution setup we will need to prioritize what parts to tackle first.
 {{file_electrical-01.pngDraft Electrical Termination Diagram}} {{file_electrical-01.pngDraft Electrical Termination Diagram}}
  
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1