engage_space:power
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
engage_space:power [2018/05/13 14:07] – Inital Design dococassi | engage_space:power [2018/05/25 07:50] – /* Distribution */ dococassi | ||
---|---|---|---|
Line 14: | Line 14: | ||
* 32 Amp Ring (P3) | * 32 Amp Ring (P3) | ||
- | The cables run to the first floor and should be tapable there to continue to a Consumer unit int the dirty workshop | + | The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable. |
- | I have a draft distribution, | + | Potentially |
- | {{file_electrical-01.pngDraft Electrical Termination Diagram}} | + | |
- | ====== | + | ====== |
- | Our breakers are located in a box. | ||
- | Peter generously donated | + | We have a schnider Easy9 Distribution box in the hall next to the dirty workshop |
- | See the drawing above to identify required breakers in the box, there can be expansion | ||
- | TODO: | + | ====== Distribution ====== |
- | * Identify and source breakers. | ||
+ | This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking and Consumer unit, you can also see the board for work to be done. | ||
- | ====== Ring Main ====== | ||
- | See drawing above for rings. O think we can get away with three one for each area. | + | {{file_floorplan-conduit.png? |
- | TODO: | ||
- | * How to run cables between floors. | ||
- | * Outlets locations | ||
- | * Conduit size and location | ||
engage_space/power.txt · Last modified: 2020/07/07 20:48 by 127.0.0.1