engage_space:power
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
engage_space:power [2018/05/13 14:13] – /* Incoming Power */ dococassi | engage_space:power [2018/05/25 07:50] – /* Distribution */ dococassi | ||
---|---|---|---|
Line 14: | Line 14: | ||
* 32 Amp Ring (P3) | * 32 Amp Ring (P3) | ||
- | The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. | + | The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable. |
- | Potentially we could change the breaker upstairs to 40 and use a 38, breaker in out box which would remove the risk of tripping the breaker upstairs | + | Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs |
- | I have a initial draft distribution setup, | ||
- | {{file_electrical-01.pngDraft Electrical Termination Diagram}} | ||
+ | ====== Consumer Unit ====== | ||
- | ====== Circuit Breaker Box ====== | ||
- | Our breakers are located in a box. | + | We have a schnider Easy9 Distribution |
- | Peter generously donated a consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door. | ||
- | See the drawing above to identify required breakers in the box, there can be expansion | + | ====== Distribution ====== |
- | TODO: | ||
- | * Identify | + | This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking |
- | ====== Ring Main ====== | ||
+ | {{file_floorplan-conduit.png? | ||
- | See drawing above for rings. O think we can get away with three one for each area. | ||
- | TODO: | ||
- | |||
- | * How to run cables between floors. | ||
- | * Outlets locations | ||
- | * Conduit size and location | ||