Line 1: Line 1:
- +^ Organiser | 
-====== Distribution ======+|  |
  
  
Line 17: Line 17:
  
 Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load. Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
 +
 +I have a JB for the wall On the first floor though no terminals as jey I also have one length og 6mm cable for to provide a power for to the consumer unit below, it is run but not connected
  
  
Line 23: Line 25:
  
 We have a schnider Easy9 Distribution box in the hall next to the dirty workshop We have a schnider Easy9 Distribution box in the hall next to the dirty workshop
 +
 +
 +
 +{{file:m2-3.jpg?400x0}}
 +
 +
  
  
Line 32: Line 40:
  
  
-  {{file_floorplan-conduit.png?400x0}}{{file_m2-3.jpg?400x0}}+  {{file:floorplan-conduit.png?400x0}} 
 + 
  
  
 +===== Lighting =====
  
  
-====== Per Device Breakers ======+see [[engage_space:lighting|Lighting]]
  
 +The main light will be fed from a 6A Breaker, this has not bee done yet, as there is a supply form above which is seperate from out Consumer unit as yet.
  
  
-===== Test Benches =====+===== Main Power Distributon =====
  
  
-In each area have a test bench which has it's own RCBO +We need to see what we need, I think this should be done in 2.5mm cable with a 20A breaker for each area or by requirement, we will have to consider upstream it we require more load.
  
  