+ | ====== General ====== | ||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | ====== Preliminary ====== | ||
+ | |||
+ | |||
+ | Empty, Doc, Hibby and Nordin, did a cracking job, | ||
+ | |||
+ | After the Space is Empty **Clean**. | ||
+ | |||
+ | Forst day cleaning Main Shelving removed and scubbed, Doc And Iona, Also shelving for Members boxes placed in hallway, see some pictures below. | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | |||
====== Main Entrance ====== | ====== Main Entrance ====== | ||
Line 13: | Line 35: | ||
====== Main Room ====== | ====== Main Room ====== | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | |||
+ | the insulation is up on the back wall. and shelving | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | |||
+ | I have power in the room now and there are desks and a center table, | ||
+ | |||
+ | The network has been started by Iain. but as yet no internet. | ||
===== Wall Coverings ===== | ===== Wall Coverings ===== | ||
+ | |||
+ | The Back Wall will be insulated with a partition, the brick wall will be left, there will be shelving put up on left hand wall. | ||
+ | |||
+ | Nothing else to do currently, we will have to see how the members fell about the noise from the venue upstairs, this may require further insulation. | ||
Line 57: | Line 101: | ||
Are we going to have music here? | Are we going to have music here? | ||
+ | |||
+ | If so, will it be independent with its own MPD or will we just be pulling audio cable through? Irl (talk) 10:29, 6 May 2018 (BST) | ||