User Tools

Site Tools


engage_space:fitout

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
engage_space:fitout [2018/05/06 09:29] – /* Music */ irlengage_space:fitout [2020/07/07 20:48] (current) – external edit 127.0.0.1
Line 1: Line 1:
 +
 +====== General ======
 +
 +
 +{{file:floorplan-01.pngLower Level Floorplan 01}}
 +
 +
 +====== Preliminary ======
 +
 +
 +Empty, Doc, Hibby and Nordin, did a cracking job,
 +
 +After the Space is Empty **Clean**.
 +
 +Forst day cleaning Main Shelving removed and scubbed, Doc And Iona, Also shelving for Members boxes placed in hallway, see some pictures below.
 +
 +
 +
 +  {{file:m1-3.jpeg?400x0}} {{file:m1-2.jpeg?400x0}} {{file:m1-1.jpeg?400x0}}
 +
 +
 +
  
 ====== Main Entrance ====== ====== Main Entrance ======
Line 13: Line 35:
 ====== Main Room ====== ====== Main Room ======
  
 +
 +
 +
 +  {{file:m2-02.jpeg?400x0}}
 +
 +
 +
 +the insulation is up on the back wall. and shelving
 +
 +
 +
 +  {{file:m2-03.jpg?400x0}}
 +
 +
 +
 +I have power in the room now and there are desks and a center table, 
 +
 +The network has been started by Iain. but as yet no internet.
  
  
 ===== Wall Coverings ===== ===== Wall Coverings =====
  
 +
 +The Back Wall will be insulated with a partition, the brick wall will be left, there will be shelving put up on left hand wall.
 +
 +Nothing else to do currently, we will have to see how the members fell about the noise from the venue upstairs, this may require further insulation.
  
  
engage_space/fitout.1525598992.txt.gz · Last modified: 2020/07/07 20:48 (external edit)