Line 3: Line 3:
  
  
-{{file_floorplan-01.pngLower Level Floorplan 01}}+{{file:floorplan-01.pngLower Level Floorplan 01}}
  
  
Line 9: Line 9:
  
  
-Empty (Possible need hands to help Andy)+Empty, Doc, Hibby and Nordin, did a cracking job, 
 + 
 +After the Space is Empty **Clean**. 
 + 
 +Forst day cleaning Main Shelving removed and scubbed, Doc And Iona, Also shelving for Members boxes placed in hallway, see some pictures below. 
 + 
 + 
 + 
 +  {{file:m1-3.jpeg?400x0}} {{file:m1-2.jpeg?400x0}} {{file:m1-1.jpeg?400x0}} 
  
-After the Space is Empty Clean. 
  
  
Line 27: Line 35:
 ====== Main Room ====== ====== Main Room ======
  
 +
 +
 +
 +  {{file:m2-02.jpeg?400x0}}
 +
 +
 +
 +the insulation is up on the back wall. and shelving
 +
 +
 +
 +  {{file:m2-03.jpg?400x0}}
 +
 +
 +
 +I have power in the room now and there are desks and a center table, 
 +
 +The network has been started by Iain. but as yet no internet.
  
  
 ===== Wall Coverings ===== ===== Wall Coverings =====
  
 +
 +The Back Wall will be insulated with a partition, the brick wall will be left, there will be shelving put up on left hand wall.
 +
 +Nothing else to do currently, we will have to see how the members fell about the noise from the venue upstairs, this may require further insulation.
  
  