engage_space:fitout
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
engage_space:fitout [2018/05/21 18:47] – Cleaning Progress. dococassi | engage_space:fitout [2020/07/07 20:48] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 3: | Line 3: | ||
- | {{file_floorplan-01.pngLower Level Floorplan 01}} | + | {{file: |
Line 17: | Line 17: | ||
- | {{file_m1-3.jpeg? | + | {{file:m1-3.jpeg? |
Line 35: | Line 35: | ||
====== Main Room ====== | ====== Main Room ====== | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | |||
+ | the insulation is up on the back wall. and shelving | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | |||
+ | I have power in the room now and there are desks and a center table, | ||
+ | |||
+ | The network has been started by Iain. but as yet no internet. | ||
===== Wall Coverings ===== | ===== Wall Coverings ===== | ||
+ | |||
+ | The Back Wall will be insulated with a partition, the brick wall will be left, there will be shelving put up on left hand wall. | ||
+ | |||
+ | Nothing else to do currently, we will have to see how the members fell about the noise from the venue upstairs, this may require further insulation. | ||
engage_space/fitout.1526928457.txt.gz · Last modified: 2020/07/07 20:48 (external edit)