Line 3: | Line 3: | ||
- | {{file_floorplan-01.pngLower Level Floorplan 01}} | + | {{file: |
Line 17: | Line 17: | ||
- | {{file_m1-3.jpeg? | + | {{file:m1-3.jpeg? |
Line 38: | Line 38: | ||
- | {{file_m2-01.jpeg? | + | {{file:m2-02.jpeg? |
+ | |||
+ | the insulation is up on the back wall. and shelving | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
+ | |||
+ | I have power in the room now and there are desks and a center table, | ||
+ | |||
+ | The network has been started by Iain. but as yet no internet. | ||
engage_space/fitout.1527199178.txt.gz · Last modified: 2020/07/07 20:48 (external edit)