engage_space:power [2018/05/25 07:50] – /* Distribution */ dococassi | engage_space:power [2020/07/07 20:48] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | + | ^ Organiser | | |
- | ====== Distribution ====== | + | | | |
Line 17: | Line 17: | ||
Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load. | Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load. | ||
+ | |||
+ | I have a JB for the wall On the first floor though no terminals as jey I also have one length og 6mm cable for to provide a power for to the consumer unit below, it is run but not connected | ||
Line 23: | Line 25: | ||
We have a schnider Easy9 Distribution box in the hall next to the dirty workshop | We have a schnider Easy9 Distribution box in the hall next to the dirty workshop | ||
+ | |||
+ | |||
+ | |||
+ | {{file: | ||
+ | |||
+ | |||
Line 32: | Line 40: | ||
- | {{file_floorplan-conduit.png? | + | {{file: |
+ | |||
+ | ===== Lighting ===== | ||
- | ====== Per Device Breakers ====== | + | see [[engage_space: |
+ | The main light will be fed from a 6A Breaker, this has not bee done yet, as there is a supply form above which is seperate from out Consumer unit as yet. | ||
- | ===== Test Benches | + | ===== Main Power Distributon |
- | In each area have a test bench which has it's own RCBO | + | We need to see what we need, I think this should be done in 2.5mm cable with a 20A breaker for each area or by requirement, |