engage_space:power [2018/04/29 17:08] – Created page with "== Incoming Power == Where do we get our power from, what is that cable rated to? == Circuit Breaker Box == Our breakers are located in a box. Where is the box? How many..." hibbyengage_space:power [2020/07/07 20:48] (current) – external edit 127.0.0.1
Line 1: Line 1:
 +^ Organiser |
 +|  |
 +
 +
  
 ====== Incoming Power ====== ====== Incoming Power ======
  
  
-Where do we get our power from, what is that cable rated to?+We have 4 supplies on 3 different phases coming to us
  
 +  *  6 Amp Lighting (P2)
 +  *  16 Amp Water Heater (P1)
 +  *  32 Amp Shower (P2)
 +  *  32 Amp Ring (P3)
  
-====== Circuit Breaker Box ======+The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable.
  
-Our breakers are located in a box.+Potentially we could change the breaker upstairs to 40A and use 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
  
-Where is the box?+I have a JB for the wall On the first floor though no terminals as jey I also have one length og 6mm cable for to provide a power for to the consumer unit below, it is run but not connected
  
-How many breakers are there? 
  
-Do we leave room for expansion?+====== Consumer Unit ======
  
  
-====== Ring Main ======+We have a schnider Easy9 Distribution box in the hall next to the dirty workshop
  
  
-How are we laying out the rings. How many do we have? Are they 1 per room? 
  
 +{{file:m2-3.jpg?400x0}}
  
-====== Outlets ====== 
  
  
-How are we laying out the outlets, both physically (position) and electrically (which ring). 
  
 +====== Distribution ======
  
-====== Per Device Breakers ====== 
  
 +This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking and Consumer unit, you can also see the board for work to be done.
  
-Are we going to have certain devices on their own?+ 
 + 
 +  {{file:floorplan-conduit.png?400x0}} 
 + 
 + 
 + 
 + 
 +===== Lighting ===== 
 + 
 + 
 +see [[engage_space:lighting|Lighting]] 
 + 
 +The main light will be fed from a 6A Breaker, this has not bee done yet, as there is a supply form above which is seperate from out Consumer unit as yet. 
 + 
 + 
 +===== Main Power Distributon ===== 
 + 
 + 
 +We need to see what we need, I think this should be done in 2.5mm cable with a 20A breaker for each area or by requirement, we will have to consider upstream it we require more load. 
 + 
 + 
 +===== Water Heater ===== 
 + 
 + 
 +In bathroom and shower, can we get rid of the shower? 
 + 
 + 
 +===== Ventilation ===== 
 + 
 + 
 +A Ventilation Fan and ducting 
 + 
 + 
 +===== Heater ===== 
 + 
 + 
 +Supply for each room.
  
  
Line 39: Line 81:
  
 Is there anything we want in the future that should be considered early on? Is there anything we want in the future that should be considered early on?
 +
 +  *  Current consumption monitoring
  
  
  
engage_space/power.1525021719.txt.gz · Last modified: 2020/07/07 20:48 (external edit)