engage_space:power [2018/05/13 14:13] – /* Incoming Power */ dococassiengage_space:power [2020/07/07 20:48] (current) – external edit 127.0.0.1
Line 1: Line 1:
- +^ Organiser | 
-====== Distribution ======+|  |
  
  
Line 14: Line 14:
   *  32 Amp Ring (P3)   *  32 Amp Ring (P3)
  
-The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32.+The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable.
  
-Potentially we could change the breaker upstairs to 40 and use a 38, breaker in out box which would remove the risk of tripping the breaker upstairs bu distributed load.+Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
  
-I have a initial draft distribution setup,  we will need to prioritize what parts to tackle first. +I have a JB for the wall On the first floor though no terminals as jey I also have one length og 6mm cable for to provide a power for to the consumer unit below, it is run but not connected
-{{file_electrical-01.pngDraft Electrical Termination Diagram}}+
  
  
-====== Circuit Breaker Box ======+====== Consumer Unit ======
  
-Our breakers are located in a box. 
  
-Peter generously donated consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door.+We have schnider Easy9 Distribution box in the hall next to the dirty workshop 
 + 
 + 
 + 
 +{{file:m2-3.jpg?400x0}} 
 + 
 + 
 + 
 + 
 +====== Distribution ======
  
-See the drawing above to identify required breakers in the box, there can be expansion 
  
-TODO:+This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking and Consumer unit, you can also see the board for work to be done.
  
-  *  Identify and source breakers. 
  
  
-====== Ring Main ======+  {{file:floorplan-conduit.png?400x0}}
  
  
-See drawing above for rings. O think we can get away with three one for each area. 
  
-TODO: 
  
-  *  How to run cables between floors. +===== Lighting =====
-  *  Outlets locations +
-  *  Conduit size and location+
  
  
-====== Per Device Breakers ======+see [[engage_space:lighting|Lighting]]
  
 +The main light will be fed from a 6A Breaker, this has not bee done yet, as there is a supply form above which is seperate from out Consumer unit as yet.
  
  
-===== Test Benches =====+===== Main Power Distributon =====
  
  
-In each area have a test bench which has it's own RCBO +We need to see what we need, I think this should be done in 2.5mm cable with a 20A breaker for each area or by requirement, we will have to consider upstream it we require more load.
  
  