Line 1: Line 1:
- +^ Organiser | 
-====== Distribution ======+|  |
  
  
Line 17: Line 17:
  
 Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load. Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
 +
 +I have a JB for the wall On the first floor though no terminals as jey I also have one length og 6mm cable for to provide a power for to the consumer unit below, it is run but not connected
  
  
Line 23: Line 25:
  
 We have a schnider Easy9 Distribution box in the hall next to the dirty workshop We have a schnider Easy9 Distribution box in the hall next to the dirty workshop
 +
 +
 +
 +{{file:m2-3.jpg?400x0}}
 +
 +
  
  
Line 28: Line 36:
  
  
-This will be done by 50mmx50mm Conduit you can see the plan for distribution below.+This will be done by 50mmx50mm Conduit you can see the plan for distribution below, Iain did some good work mounting the first section of trunking and Consumer unit, you can also see the board for work to be done. 
 + 
  
 +  {{file:floorplan-conduit.png?400x0}}
  
  
-  {{file_floorplan-conduit.png?400x0}} 
  
  
 +===== Lighting =====
  
  
-====== Per Device Breakers ======+see [[engage_space:lighting|Lighting]]
  
 +The main light will be fed from a 6A Breaker, this has not bee done yet, as there is a supply form above which is seperate from out Consumer unit as yet.
  
  
-===== Test Benches =====+===== Main Power Distributon =====
  
  
-In each area have a test bench which has it's own RCBO +We need to see what we need, I think this should be done in 2.5mm cable with a 20A breaker for each area or by requirement, we will have to consider upstream it we require more load.
  
  