== Distribution ==
 +
 
== Incoming Power ==  
 
== Incoming Power ==  
  
Where do we get our power from, what is that cable rated to?
+
We have 4 supplies on 3 different phases coming to us
 +
 
 +
* 6 Amp Lighting (P2)
 +
* 16 Amp Water Heater (P1)
 +
* 32 Amp Shower (P2)
 +
* 32 Amp Ring (P3)
 +
 
 +
The cables run to the first floor and should be tapable there to continue to a Consumer unit int the dirty workshop
 +
 
 +
I have a draft distribution, we will need to prioritize what parts to tackle first.
 +
[[:File:Electrical-01.png | Draft Electrical Termination Diagram]]
  
 
== Circuit Breaker Box ==
 
== Circuit Breaker Box ==
 
Our breakers are located in a box.
 
Our breakers are located in a box.
  
Where is the box?
+
Peter generously donated a consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door.
  
How many breakers are there?
+
See the drawing above to identify required breakers in the box, there can be expansion
  
Do we leave room for expansion?
+
TODO:
 +
 
 +
* Identify and source breakers.
  
 
== Ring Main ==
 
== Ring Main ==
  
How are we laying out the rings. How many do we have? Are they 1 per room?
+
See drawing above for rings. O think we can get away with three one for each area.
 +
 
 +
TODO:
 +
 
 +
* How to run cables between floors.
 +
* Outlets locations
 +
* Conduit size and location
 +
 
 +
== Per Device Breakers ==
 +
 
 +
=== Test Benches ===
 +
 
 +
In each area have a test bench which has it's own RCBO
 +
 
 +
=== Water Heater ===
 +
 
 +
In bathroom and shower, can we get rid of the shower?
  
== Outlets ==  
+
=== Ventilation ===
  
How are we laying out the outlets, both physically (position) and electrically (which ring).
+
A Ventilation Fan and ducting
  
== Per Device Breakers ==  
+
=== Heater ===
  
Are we going to have certain devices on their own?
+
Supply for each room.
  
 
== Future Desires ==
 
== Future Desires ==
Line 28: Line 58:
 
Is there anything we want in the future that should be considered early on?
 
Is there anything we want in the future that should be considered early on?
  
* Kev's Testing Setup
 
 
* Current consumption monitoring
 
* Current consumption monitoring
  
 
[[Category: EngageSpace]]
 
[[Category: EngageSpace]]

Revision as of 14:07, 13 May 2018

Distribution

Incoming Power

We have 4 supplies on 3 different phases coming to us

  • 6 Amp Lighting (P2)
  • 16 Amp Water Heater (P1)
  • 32 Amp Shower (P2)
  • 32 Amp Ring (P3)

The cables run to the first floor and should be tapable there to continue to a Consumer unit int the dirty workshop

I have a draft distribution, we will need to prioritize what parts to tackle first. Draft Electrical Termination Diagram

Circuit Breaker Box

Our breakers are located in a box.

Peter generously donated a consumer unit for us. The best place for it would be in the dirty workshop on the right as you come in the door.

See the drawing above to identify required breakers in the box, there can be expansion

TODO:

  • Identify and source breakers.

Ring Main

See drawing above for rings. O think we can get away with three one for each area.

TODO:

  • How to run cables between floors.
  • Outlets locations
  • Conduit size and location

Per Device Breakers

Test Benches

In each area have a test bench which has it's own RCBO

Water Heater

In bathroom and shower, can we get rid of the shower?

Ventilation

A Ventilation Fan and ducting

Heater

Supply for each room.

Future Desires

Is there anything we want in the future that should be considered early on?

  • Current consumption monitoring