User Tools

Site Tools


engage_space:fitout

This is an old revision of the document!


General

Preliminary

Empty (Possible need hands to help Andy)

After the Space is Empty Clean.

Main Entrance

Main Door

The main door is a fire egress path. We need to detail the manufacturer and dimensions of the door, locking mechanism and then consider how we shall permit users to enter/exit space.

Main Room

Wall Coverings

Music

The stereo is moving. How are we mounting it? Where are the Loudspeakers living?

Video Screen

Are we going to wall mount the TV in this room? Projector?

Workshop Room

Door Lock

To prevent access to the downstairs area.

Working Areas

Are we going to split out a couple of work areas in here? Will there be dirty tools? Vacuum for cleaning up after yourself? Signage to remind members to be clean?

Music

Are we going to have music here?

If so, will it be independent with its own MPD or will we just be pulling audio cable through? Irl (talk) 10:29, 6 May 2018 (BST)

Upstairs Room

Door Lock

To prevent access to the upstairs area / bathroom.

Music

Do we want music?

engage_space/fitout.1526246475.txt.gz · Last modified: 2020/07/07 20:48 (external edit)