Distribution

Incoming Power

We have 4 supplies on 3 different phases coming to us

  • 6 Amp Lighting (P2)
  • 16 Amp Water Heater (P1)
  • 32 Amp Shower (P2)
  • 32 Amp Ring (P3)

The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable.

Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.

Consumer Unit

We have a schnider Easy9 Distribution box in the hall next to the dirty workshop

Distribution

This will be done by 50mmx50mm Conduit you can see the plan for distribution below.

{{file_floorplan-conduit.png?400x0}}

Per Device Breakers

Test Benches

In each area have a test bench which has it's own RCBO

Water Heater

In bathroom and shower, can we get rid of the shower?

Ventilation

A Ventilation Fan and ducting

Heater

Supply for each room.

Future Desires

Is there anything we want in the future that should be considered early on?

  • Current consumption monitoring