Distribution
Incoming Power
We have 4 supplies on 3 different phases coming to us
- 6 Amp Lighting (P2)
- 16 Amp Water Heater (P1)
- 32 Amp Shower (P2)
- 32 Amp Ring (P3)
The cables run to the first floor and should be tapable there to continue to a Consumer unit in the dirty workshop, the 16 could be changed for a 32. though this would require replacement of the cable.
Potentially we could change the breaker upstairs to 40A and use a 32A breaker in our box which would remove the risk of tripping the breaker upstairs by distributed load.
Consumer Unit
We have a schnider Easy9 Distribution box in the hall next to the dirty workshop
Distribution
This will be done by 50mmx50mm Conduit you can see the plan for distribution below.
{{file_floorplan-conduit.png?400x0}}
Per Device Breakers
Test Benches
In each area have a test bench which has it's own RCBO
Water Heater
In bathroom and shower, can we get rid of the shower?
Ventilation
A Ventilation Fan and ducting
Heater
Supply for each room.
Future Desires
Is there anything we want in the future that should be considered early on?
- Current consumption monitoring