User Tools

Site Tools


projects:other_3d_printers

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
projects:other_3d_printers [2021/02/02 20:28] – [Maker Architect "Woods"] Wouterprojects:other_3d_printers [2021/09/07 20:09] hibby
Line 96: Line 96:
 **Summary:** Space-made with DIY components; 1.75mm Filament, rather hacky; Hothead issues; Working pending head rebuild. **Summary:** Space-made with DIY components; 1.75mm Filament, rather hacky; Hothead issues; Working pending head rebuild.
  
-**State:** Unused for some time and in need of a hot-head rebuild. Previously, the main board (Sanguinoliu 1.3a) failed due to over-heating problems at the PID hot-bed power output. The board's bed power FET has been bypassed with the 5v logic directly driving an external relay for bang-bang bed control. The XYZ mechanics are working but the hothead assembly failed due to it's plastic cracking. A replacement hothead assembly has been printed and new head purchased. The new head is wired in and is awaiting fitting into the replacement head assembly and fixing on to the X-carriage. Manual bed-levelling lacks precision, but is functional. +**State:** Unused for some time. Head has been recently rebuilt using reprinted carriage head and new hothead [21/03/21]. Previously, the main board (Sanguinoliu 1.3a) failed due to over-heating problems at the PID hot-bed power output. The board's bed PID power FET has been bypassed with the 5v logic directly driving an external relay for bang-bang bed control. The XYZ mechanics are working. Manual bed-levelling lacks precision, but is functional. Recommend inverting the leveling bolt/nut and adding a 3d Printed knob to the nut for easier levelling (Like the Ender3).
    
 In order to be able to print, the following maintenance steps will be required first: In order to be able to print, the following maintenance steps will be required first:
-  * Hot-head rebuild 
   * Sourcing of power supply   * Sourcing of power supply
   * Manual levelling improvements (ideally)   * Manual levelling improvements (ideally)
Line 113: Line 112:
 It would be good for someone to itemise these at some point.  It would be good for someone to itemise these at some point. 
  
 +{{tag>project active tools}}
  
projects/other_3d_printers.txt · Last modified: 2023/04/23 12:14 by Stephanie Davidson